Gas treatment of biogas on biomethane
Customer/Location: Wien Energie / Wien-Pfaffenau, MA48, AT
Turnkey 3-stage gas treatment plant with EVONIK Sepuran modules - for biogas from the MBA in 4 pieces 30" containers.
Incl. gas cooling, pre-cleaning, high-pressure compressor and offgas aftertreatment.
Execution
- Lt. Atex Kat. II 2 G, Pressure Equipment Directive, Operating pressure max. 19 bar
- Acceptance by TÜV Austria
- Volume flow inlet: 100 - 350Nm3/h biogas
- Volume flow outlet: 50 - 175Nm3/h biomethane
- Pressure: 16bar
- Commissioning: January 2015