Gas treatment of biogas on biomethane

Gas treatment of biogas on biomethane

Customer/Location: Wien Energie / Wien-Pfaffenau, MA48, AT

Turnkey 3-stage gas treatment plant with EVONIK Sepuran modules - for biogas from the MBA in 4 pieces 30" containers.

Incl. gas cooling, pre-cleaning, high-pressure compressor and offgas aftertreatment.

Execution

  • Lt. Atex Kat. II 2 G, Pressure Equipment Directive, Operating pressure max. 19 bar
  • Acceptance by TÜV Austria
  • Volume flow inlet: 100 - 350Nm3/h biogas
  • Volume flow outlet: 50 - 175Nm3/h biomethane
  • Pressure: 16bar
  • Commissioning: January 2015