High-temperature flare
MTU-HT

Two large silver storage containers and a cooling system in an industrial setting.

GAS FLARE MTU-HT High-Temperature Flare The MTU-HT series is designed as an operating flare (according to TA-Luft) with automatic flue gas temperature control at 1000 °C and a residence time of at least 0.3 seconds. Areas of application: Thermal disposal of combustible excess gases (landfill gas plants) Various specialty gases Suitable for continuous operation Design of our MTU-HT High-Temperature Flare MTU-HT flares are supplied with heat-resistant ceramic insulation (up to 1220 °C) and an automatically controlled air intake damper. The flares are… Read more High-temperature flare
MTU-HT

Medium-temperature flare shortened
MTU-v

Industrial measuring station with a large pipe and a control unit on a roof.

GAS FLARE Medium-temperature flare, shortened MTU-v. Based on the modular MTU gas flare, a shortened version was introduced as the MTU-v. Areas of application: Thermal disposal of combustible excess gases (e.g., in biogas, sewage treatment, and landfill gas plants), various special gases. Design: The MTU-v gas flare with partially concealed combustion is available with or without a gas compressor and is delivered ready for operation according to customer requirements and can be used immediately. Read more Medium-temperature flare shortened
MTU-v

Medium-temperature flare
MTU

Industrial lighting unit with several orange lamps under a round, illuminated surface.

GAS FLARE MTU Medium-Temperature Flare The MTU series serves as a start-up and emergency flare (according to TA Luft) with concealed combustion. The flare's modular design allows for various sizes and configurations. Areas of application for the MTU Medium-Temperature Flare include: Thermal disposal of combustible excess gases (e.g., in biogas, sewage treatment, and landfill gas plants) Various special gases Design The MTU Medium-Temperature Flares are available depending on the... Read more Medium-temperature flare
MTU

Gas flare and compressor station Kuwait

Two electric motors with connected pipes in a technical room.

Supply, installation and commissioning of a redundant high-temperature flare system for a total of 2600 Nm³/h of biogas, as well as a central compressor station for 3000 Nm³/h with control and pressure regulation.

Successful Green Gas Congress 2024 in St. Pölten: Exchange, innovation and future perspectives

Logo of the event grüngas with the topics biogas, wood gas and hydrogen.

From December 4 to 6, 2024, the green gas congress grüngas24 took place at WIFI St. Pölten – an event that impressed not only with its 20th anniversary, but also with its expansion to three days. With 45 exhibitors, 43 speakers, and around 350 participants, the event offered a unique platform for exchange on all aspects of… Read more Successful Green Gas Congress 2024 in St. Pölten: Exchange, innovation and future perspectives

en_GBEN