Gas preparation and feed-in

Gas preparation and feed-in

Customer/Location: ZAF Aarberg /CH

Turnkey gas compressor station with gas cooling and active column filter for biogas in the purposely constructed building. Incl. feed-in station with gas analysis and control of the mixing ratio, according to the specifications of the SVGW.

Execution

  • Lt. Atex Kat. II 3 G and fire protection class F90
  • Acceptance by: TÜV Austria and SVGW
  • Volume flow: 200 - 550Nm3/h
  • Pressure increase: 6 bar
  • Commissioning: October 2014