Gas treatment of biogas on biomethane
Customer/Location: Methapower GmbH /Dannheim DE
Customer-specific 3-stage gas treatment plant with EVONIK Sepuran modules.
Execution
- for biogas in a two-storey lightweight building hall
- Lt. Atex Kat. II 3 G, Pressure Equipment Directive, Operating pressure max. 20 bar
- Acceptance by TÜV Austria
- Volume flow intake: 450Nm³/h biogas
- Volume flow outlet:220Nm³/h biomethane
- Pressure: 16bar
- Commissioning May 2014