Gas treatment of biogas on biomethane
Customer/Location: Methapower GmbH / Chittering GB
Customer-specific 3-stage gas treatment plant with EVONIK Sepuran modules.
Execution
- for biogas in a two-storey lightweight building hall
- Lt. Atex Kat. II 3 G, Pressure Equipment Directive, Operating pressure max. 20 bar
- Acceptance by TÜV Austria
- Volume flow intake: 2000Nm3/h biogas
- Volume flow outlet: 1000Nm3/h biomethane
- Pressure: 16bar
- Commissioning: July 2014