Gas treatment of biogas on biomethane

Gas treatment of biogas on biomethane

Customer/Location: Methapower GmbH / Chittering GB

Customer-specific 3-stage gas treatment plant with EVONIK Sepuran modules.

Execution

  • for biogas in a two-storey lightweight building hall
  • Lt. Atex Kat. II 3 G, Pressure Equipment Directive, Operating pressure max. 20 bar
  • Acceptance by TÜV Austria
  • Volume flow intake: 2000Nm3/h biogas
  • Volume flow outlet: 1000Nm3/h biomethane
  • Pressure: 16bar
  • Commissioning: July 2014