Module Unit Gas Treatment 1400/3 -16bar France
Customer/Location: Agrikomp GmbH/F
As an Evonik contractor, we offer the design and delivery of 3-stage gas treatment plants with Evonik Sepuran hollow fiber modules.
The patented 3-stage processing process may only be used when ordering a complete membrane unit consisting of 3 module racks by our customers.
Execution
- Lt. Pressure Equipment Directive, operating pressure max. 20bar
- Acceptance by TÜV Süd
- Volume flow inlet: 1400Nm3/h biogas
- Volume flow outlet: 750Nm3/h biomethane
- Pressure: 16bar
- Commissioning 2016